This document details the redesign of the Report Builder - financial pathway app included in our latest Data Discovery release.

For the next few months, you will have access to both the old version and new version of the app so you have time to familiarise yourself with the new version before the old version is removed. The new version has a red banner with “new” written in it in the icon for the app:

Our aim with this document is to enable you to:

  1. Familiarise yourself with how to use the new version

  2. Update your Data Discovery report mapping spreadsheets to reflect the new version

  3. Update any bookmarks you have saved

  4. Update any saved views (created using “Monitor in activity center”)

We highly recommend you set aside time to complete these steps over the next 3 months. We are available to provide further support with this, contact us at: support@noted.com

Key Changes Overview

This release focuses on enabling the Report builder - Requests View to support Whanaunga āwhina, a planned Noted feature which will replace the Whānau feature. Improvements to user experience have also been incorporated based on your feedback.

Feature Area

Previous Version

New Version

Whanaunga āwhina

Not supported

Supported

User Interface

Cluttered, less intuitive navigation

Streamlined, cleaner design improved navigation

Line report builder

Large number of columns included by default in report

More flexibility - less columns included by default, more options of what to add

Look up sheets

Separate sheets for each set of tables

Simplification to one sheet with all look up tables

Detailed comparison for report mapping

The following tables are designed to assist you in updating your report mapping spreadsheets to the new version. Most of the terminology is similar but dropdowns have been reorganised. Rather than reading through these tables end to end, we suggest that you use them for searching for anything you can’t find in the new version or where you aren’t sure if you’ve found the equivalent to your previous mapping. You may want to use ctrl + F to search for a term from your report mapping to find its equivalent in the new version.

Note: terminology used here is the generic Noted terms, your organisation may have custom words in place of some of these e.g. “Client” may be displayed as “Tangata” or “Whaiora” for your organisation.

Aggregate report builder sheet

Mapping

Old Version

New Version

Select/define counts: Unique Requests/Financial pathways with specific date in period

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways then choose an option from select date to be in period

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = select an option that matches the option from the old version

Select/define counts: Unique Requests/Financial pathways with Financial pathway outcome date

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways then select date to be in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Financial pathway outcome date

Select/define counts: Unique Requests/Financial pathways with Financial pathway start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways then select date to be in period = Financial pathway start date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Financial pathway start date

Select/define counts: Unique Requests/Financial pathways with Request date

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways then select date to be in period = Request date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Request date

Select/define counts: Unique Requests/Financial pathways with Request decision date

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways then select date to be in period = Request decision date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Request decision date

Select/define counts: Unique Requests/Financial pathways with Specific Financial pathway status start date

Get counts based on specific dates in period - select unique count you wish to add = Specific Financial pathway status start date then select date to be in period = Request outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Request outcome date

Select/define counts: Unique Requests/Financial pathways with Specific Request status start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways, Select date to be in period = Specific Request status start date then choose option from Select specific Request status

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Specific Request status start date

5 Which specific status? = choose the appropriate option

Select/define counts: Unique Requests/Financial pathways with Specific Financial pathway status start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Requests/Financial pathways, Select date to be in period = Specific Financial pathway status start date then choose an option from Select specific Financial pathway status?

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Specific Financial pathway status start date

5 Which specific status? = choose the appropriate option

Select/define counts: Unique Tangata with specific date in period

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata then choose an option from select date to be in period

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which Tangata should be counted? = select an option that matches the option from the old version

Select/define counts: Unique Tangata with Financial pathway outcome date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Financial pathway outcome date

Select/define counts: Unique Tangata with Financial pathway start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Financial pathway start date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Financial pathway start date

Select/define counts: Unique Tangata with Request date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Request date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Request date

Select/define counts: Unique Tangata with Request decision date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Request decision date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Request decision date

Select/define counts: Unique Tangata with Request outcome date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Request outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Request outcome date

Select/define counts: Unique Tangata with Specific Request status start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Specific Request status start date then choose an option from Select specific Request status

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Specific Request status start date

6. Which specific status? = choose the appropriate option

Select/define counts: Unique Tangata with Financial pathway status start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Tangata, Select date to be in period = Financial pathway status start date then choose an option from Select specific Financial pathway status

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Tangata at Request date

5. Which date should be in period? = Specific Financial pathway status start date

6. Which specific status? = choose the appropriate option

Select/define counts: Unique Whānau with specific date in period

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau then choose an option from select date to be in period

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = select an option that matches the option from the old version

Select/define counts: Unique Whānau with Financial pathway outcome date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Financial pathway outcome date

Select/define counts: Unique Whānau with Financial pathway start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Financial pathway start date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Financial pathway start date

Select/define counts: Unique Whānau with Request date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Request date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Request date

Select/define counts: Unique Whānau with Request decision date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Request decision date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Request decision date

Select/define counts: Unique Whānau with Request outcome date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Request outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which Tangata should be counted? = Request outcome date

Select/define counts: Unique Whānau with Specific Request status start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Specific Request status start date then choose an option from Select specific Request status

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Specific Request status start date

5. Which specific status? = choose the appropriate option

Select/define counts: Unique Whānau with Financial pathway status start date

Get counts based on specific dates in period - select unique count you wish to add = Unique Whānau, Select date to be in period = Specific Financial pathway status start date then choose an option from Select specific Request status

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. What should the counts be based on? = Specific date being in reporting period

4. Which date should be in period? = Specific Financial pathway status start date

5. Which specific status? = choose the appropriate option

Select/define counts: Unique Requests/Financial pathways with specific active status and when active dates

Get active counts - Select unique count you wish to add = Unique Requests/Financial pathways, Select when active - choose an option from list, Select how active - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = choose the appropriate option

Select/define counts: Unique Requests/Financial pathways with Requests without request decision date

Get active counts - Select unique count you wish to add = Unique Requests/Financial pathways, Select when active - choose an option from list, Select how active = Requests without request decision date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Requests without request decision date

Select/define counts: Unique Requests/Financial pathways with Financial pathway without financial pathway outcome date

Get active counts - Select unique count you wish to add = Unique Requests/Financial pathways, Select when active - choose an option from list, Select how active = Financial pathway without financial pathway outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Financial pathway without financial pathway outcome date

Select/define counts: Unique Requests/Financial pathways with Requests without request outcome date

Get active counts - Select unique count you wish to add = Unique Requests/Financial pathways, Select when active - choose an option from list, Select how active = Requests without request outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Requests without request outcome date

Select/define counts: Unique Requests/Financial pathways with specific active status and Specific Request status

Get active counts - Select unique count you wish to add = Unique Requests/Financial pathways, Select when active - choose an option from list, Select how active - Specific Request status, Select specific Request status - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Specific Request status without Request status end date

6. Which specific status? = choose the appropriate option

Select/define counts: Unique Requests/Financial pathways with specific active status and Specific Financial pathway status

Get active counts - Select unique count you wish to add = Unique Requests/Financial pathways, Select when active - choose an option from list, Select how active - Specific Financial pathway status, Select specific Request status - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Requests/Financial pathways

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Specific Financial pathway status without Financial pathway status end date

6. Which specific status? = choose the appropriate option

Select/define counts: Unique Whaiora with specific active status and when active dates

Get active counts - Select unique count you wish to add = Unique Whaiora, Select when active - choose an option from list, Select how active - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. Which Tangata should be counted? = Tangata at Request date

4. What should the counts be based on? = Active at start, end or any time during reporting period

5. When should the Requests be active? = choose the appropriate option

6. How should the Requests be active? = choose the appropriate option

Select/define counts: Unique Whaiora with Requests without request decision date

Get active counts - Select unique count you wish to add = Unique Whaiora, Select when active - choose an option from list, Select how active = Requests without request decision date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. Which Tangata should be counted? = Tangata at Request date

4. What should the counts be based on? = Active at start, end or any time during reporting period

5. When should the Requests be active? = choose the appropriate option

6. How should the Requests be active? = Requests without request decision date

Select/define counts: Unique Whaiora with Financial pathway without financial pathway outcome date

Get active counts - Select unique count you wish to add = Unique Whaiora, Select when active - choose an option from list, Select how active = Financial pathway without financial pathway outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. Which Tangata should be counted? = Tangata at Request date

4. What should the counts be based on? = Active at start, end or any time during reporting period

5. When should the Requests be active? = choose the appropriate option

6. How should the Requests be active? = Financial pathway without financial pathway outcome date

Select/define counts: Unique Whaiora with Requests without request outcome date

Get active counts - Select unique count you wish to add = Unique Whaiora, Select when active - choose an option from list, Select how active = Requests without request outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. Which Tangata should be counted? = Tangata at Request date

4. What should the counts be based on? = Active at start, end or any time during reporting period

5. When should the Requests be active? = choose the appropriate option

6. How should the Requests be active? = Requests without request outcome date

Select/define counts: Unique Whaiora with specific active status and Specific Request status

Get active counts - Select unique count you wish to add = Unique Whaiora, Select when active - choose an option from list, Select how active - Specific Request status, Select specific Request status - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. Which Tangata should be counted? = Tangata at Request date

4. What should the counts be based on? = Active at start, end or any time during reporting period

5. When should the Requests be active? = choose the appropriate option

6. How should the Requests be active? = Specific Request status without Request status end date

7. Which specific status? = choose the appropriate option

Select/define counts: Unique Whaiora with specific active status and Specific Financial pathway status

Get active counts - Select unique count you wish to add = Unique Whaiora, Select when active - choose an option from list, Select how active - Specific Financial pathway status, Select specific Request status - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Tangata

3. Which Tangata should be counted? = Tangata at Request date

4. What should the counts be based on? = Active at start, end or any time during reporting period

5. When should the Requests be active? = choose the appropriate option

6. How should the Requests be active? = Specific Financial pathway status without Financial pathway status end date

7. Which specific status? = choose the appropriate option

Select/define counts: Unique Whānau with specific active status and when active dates

Get active counts - Select unique count you wish to add = Unique Whānau, Select when active - choose an option from list, Select how active - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = choose the appropriate option

Select/define counts: Unique Whānau with Requests without request decision date

Get active counts - Select unique count you wish to add = Unique Whānau, Select when active - choose an option from list, Select how active = Requests without request decision date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Requests without request decision date

Select/define counts: Unique Whānau with Financial pathway without financial pathway outcome date

Get active counts - Select unique count you wish to add = Unique Whānau, Select when active - choose an option from list, Select how active = Financial pathway without financial pathway outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Financial pathway without financial pathway outcome date

Select/define counts: Unique Whānau with Requests without request outcome date

Get active counts - Select unique count you wish to add = Unique Whānau, Select when active - choose an option from list, Select how active = Requests without request outcome date

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Requests without request outcome date

Select/define counts: Unique Whānau with specific active status and Specific Request status

Get active counts - Select unique count you wish to add = Unique Whānau, Select when active - choose an option from list, Select how active - Specific Request status, Select specific Request status - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Specific Request status without Request status end date

6. Which specific status? = choose the appropriate option

Select/define counts: Unique Whānau with specific active status and Specific Financial pathway status

Get active counts - Select unique count you wish to add = Unique Whānau, Select when active - choose an option from list, Select how active - Specific Financial pathway status, Select specific Request status - choose an option from list

Define count:

1. Do you wish to count or sum = Count

2. What do you wish to count = Unique Whanaunga āwhina

3. What should the counts be based on? = Active at start, end or any time during reporting period

4. When should the Requests be active? = choose the appropriate option

5. How should the Requests be active? = Specific Financial pathway status without Financial pathway status end date

6. Which specific status? = choose the appropriate option

Select/define counts: Request amount by Request date

Get sums of amounts - Select which amount to sum = Requested amount, Select which instances to sum based on date in period = Request date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Requested amount

3. Select which instance to sum based on date in period = Request date

Select/define counts: Request amount by Financial pathway outcome date

Get sums of amounts - Select which amount to sum = Requested amount, Select which instances to sum based on date in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Requested amount

3. Select which instance to sum based on date in period = Financial pathway outcome date

Select/define counts: Financial pathway quotes amount by Request date

Get sums of amounts - Select which amount to sum = Financial pathway quotes amount, Select which instances to sum based on date in period = Request date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway quotes amount

3. Select which instance to sum based on date in period = Request date

Select/define counts: Financial pathway quotes amount by Financial pathway outcome date

Get sums of amounts - Select which amount to sum = Financial pathway quotes amount, Select which instances to sum based on date in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway quotes amount

3. Select which instance to sum based on date in period = Financial pathway outcome date

Select/define counts: Financial pathway quotes amount by Financial pathway quote received date

Get sums of amounts - Select which amount to sum = Financial pathway quotes amount, Select which instances to sum based on date in period = Financial pathway quote received date (Only works for Financial pathway quoted amount)

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway quotes amount

3. Select which instance to sum based on date in period = Financial pathway quote received date (Only works for Financial pathway quoted amount)

Select/define counts: Financial pathway paid amount by Request date

Get sums of amounts - Select which amount to sum = Financial pathway paid amount, Select which instances to sum based on date in period = Request date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway paid amount

3. Select which instance to sum based on date in period = Request date

Select/define counts: Financial pathway paid amount by Financial pathway outcome date

Get sums of amounts - Select which amount to sum = Financial pathway paid amount, Select which instances to sum based on date in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway paid amount

3. Select which instance to sum based on date in period = Financial pathway outcome date

Select/define counts: Financial pathway paid amount by Financial pathway paid date

Get sums of amounts - Select which amount to sum = Financial pathway paid amount, Select which instances to sum based on date in period = Financial pathway paid date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway paid amount

3. Select which instance to sum based on date in period = Financial pathway paid date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Select/define counts: Financial pathway paid amount by Financial pathway spent date

Get sums of amounts - Select which amount to sum = Financial pathway paid amount, Select which instances to sum based on date in period = Financial pathway spent date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway paid amount

3. Select which instance to sum based on date in period = Financial pathway spent date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Select/define counts: Financial pathway spent amount by Request date

Get sums of amounts - Select which amount to sum = Financial pathway spent amount, Select which instances to sum based on date in period = Request date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway spent amount

3. Select which instance to sum based on date in period = Request date

Select/define counts: Financial pathway spent amount by Financial pathway outcome date

Get sums of amounts - Select which amount to sum = Financial pathway spent amount, Select which instances to sum based on date in period = Financial pathway outcome date

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway spent amount

3. Select which instance to sum based on date in period = Financial pathway outcome date

Select/define counts: Financial pathway spent amount by Financial pathway paid date

Get sums of amounts - Select which amount to sum = Financial pathway spent amount, Select which instances to sum based on date in period = Financial pathway paid date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway spent amount

3. Select which instance to sum based on date in period = Financial pathway paid date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Select/define counts: Financial pathway spent amount by Financial pathway spent date

Get sums of amounts - Select which amount to sum = Financial pathway spent amount, Select which instances to sum based on date in period = Financial pathway spent date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Define count:

1. Do you wish to count or sum = Sum up numbers

2. Select which amount to sum = Financial pathway spent amount

3. Select which instance to sum based on date in period = Financial pathway spent date (Only work for Financial pathway paid amount and Financial pathway spent amount)

Breakdown options

Reporting period breakdown options - report date breakdown

Reporting period breakdown options - report date breakdown. Dropdowns have the same options

Breakdown options

Static demographic options - gender, age, ancestral root/whakapapa

Tangata specific info options:

1. Select which Tangata the breakdown info should be for. If counting unique Tangata, make sure your count options match the same as under “Which Tangata should be counted?’ at the top of the report, otherwise select an option from the dropdown that is appropriate for your needs

2. Select Tangata information - you can now select gender, age, ancestral root/whakapapa

Breakdown options

Interval type information for Whaiora - When should the interval type information be true? - Request date/Request outcome date

Responsibility info options - Responsible Kaimahi. Select the appropriate date you wish to use.

Breakdown options

Interval type options - Responsible Kaimahi

Responsibility info options true on Request date - Breakdown by Responsible Kaimahi at time of Request date

Breakdown options

Interval type options - Tangata’s tag name

Tangata specific info options:

1. Select which Tangata the breakdown info should be for. If counting unique Tangata, make sure your count options match the same as under “Which Tangata should be counted?’ at the top of the report, otherwise select an option from the dropdown that is appropriate for your needs

2. Select at what time period you wish Tangata’s tag name from Tangata’s tag name option

Breakdown options

Interval type options - Tangata role lvl1

Tangata info options:

1. Select which Tangata the breakdown info should be for. If counting unique Tangata, make sure your count options match the same as under “Which Tangata should be counted?’ at the top of the report, otherwise select an option from the dropdown that is appropriate for your needs

2. Select an option from Tangata role lvl1

Breakdown options

Interval type options - Tangata role lvl2

Tangata specific info options:

1. Select which Tangata the breakdown info should be for. If counting unique Tangata, make sure your count options match the same as under “Which Tangata should be counted?’ at the top of the report, otherwise select an option from the dropdown that is appropriate for your needs

2. Select an option from Tangata role lvl2

Breakdown options

Request and Financial pathway information - Request and Financial pathway information

Request/Financial pathway info options - Request/Financial pathway fields

Breakdown options

Request and Financial pathway information - Financial pathway payment information

Request/Financial pathway info options - Financial pathway payment information

Line report builder sheet

Mapping

Old Version

New Version

Select Requests/Financial pathway: Financial pathway outcome date

How to relate relate data to reporting period = By date in period, Select date to be in period = Financial pathway outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Financial pathway outcome date

Select Requests/Financial pathway: Financial pathway start date

How to relate relate data to reporting period = By date in period, Select date to be in period = Financial pathway start date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Financial pathway start date

Select Requests/Financial pathway: Request date

How to relate relate data to reporting period = By date in period, Select date to be in period = Request date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Request date

Select Requests/Financial pathway: Request decision date

How to relate relate data to reporting period = By date in period, Select date to be in period = Request decision date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Request decision date

Select Requests/Financial pathway: Request outcome date

How to relate relate data to reporting period = By date in period, Select date to be in period = Request outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Request outcome date

Select Requests/Financial pathway: Specific Request status start date

How to relate relate data to reporting period = By date in period, Select date to be in period = Specific Request status start date, Select specific Request status = select appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Specific Request status start date

3. Which specific status? = Select appropriate option

Select Requests/Financial pathway: Specific Financial pathway status start date

How to relate relate data to reporting period = By date in period, Select date to be in period = Specific Financial pathway status start date, Select specific Request status = select appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Specific Financial pathway status start date

3. Which specific status? = Select appropriate option

Select Requests/Financial pathway: Requests without Request decision date - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Requests without Request decision date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Requests without Request decision date

Select Requests/Financial pathway: Financial pathway without Financial pathway outcome date - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Financial pathway without Financial pathway outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Financial pathway without Financial pathway outcome date

Select Requests/Financial pathway: Requests without Request outcome date - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Requests without Request outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Requests without Request outcome date

Select Requests/Financial pathway: Specific Request status - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Specific Request status, Select specific Request status = choose appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Specific Request status without Request status end date

4. Which specific status? = choose appropriate option

Select Requests/Financial pathway: Specific Financial pathway status - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Specific Financial pathway status, Select specific Request status = choose appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Specific Financial pathway status without Financial pathway status end date

4. Which specific status? = choose appropriate option

Select Requests, Waitlistings and/or Team pathways: Request date in period

How to relate reporting period to Requests = Request date in period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period = Request date

Select Requests, Waitlistings and/or Team pathways: Request decision date in period

How to relate reporting period to Requests = Request decision date in period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period = Request decision date

Select Requests, Waitlistings and/or Team pathways: Request followup date in period

How to relate reporting period to Requests = Request followup date in period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period = Request followup date

Select Requests, Waitlistings and/or Team pathways: Request outcome date in period

How to relate reporting period to Requests = Request outcome date in period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period = Request outcome date

Select Requests, Waitlistings and/or Team pathways: Request awaiting decision at start of period

How to relate reporting period to Requests = Request awaiting decision at start of period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. How should the Request be active? = Requests without Request decision date

3. When should the Requests be active? = At start reporting period

Select Requests, Waitlistings and/or Team pathways: Request awaiting decision at any time in period

How to relate reporting period to Requests = Request awaiting decision at any time in period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. How should the Request be active? = Requests without Request decision date

3. When should the Requests be active? = Any time during period

Select Requests, Waitlistings and/or Team pathways: Request awaiting decision at end period

How to relate reporting period to Requests = Request awaiting decision at end period

How should Requests relate to the reporting period

1. How should Requests, Waitlistings, and/or Team pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. How should the Request be active? = Requests without Request decision date

3. When should the Requests be active? = At end reporting period

Select how to relate Tagnata interval type data to Requests/Financial pathways and reporting period

Select how to relate Tangata interval type data to Requests/Financial pathways and reporting period - Select how to relate the interval type data to Request/Financial pathways and reporting period

Tangata information - Select which Tangata should be added = select the appropriate option

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period: Occurred between Request date and Request decision date

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period = Occurred between Request date and Request decision date

Activity session and/or Action information:

1. Select which dates the Activity session/Action should have occurred between (selected dates included)= Request date and Request decision date

2. Select if Activity sessions/Actions should have occurred in reporting period or not - select the appropriate option

3. Select what kind of Activity session/Action info to add - select the appropriate option

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period: Occurred between Financial pathway start date and Financial pathway outcome date

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period = Occurred between Financial pathway start date and Financial pathway outcome date

Activity session and/or Action information:

1. Select which dates the Activity session/Action should have occurred between (selected dates included)= Financial pathway start date and Financial pathway outcome date

2. Select if Activity sessions/Actions should have occurred in reporting period or not - select the appropriate option

3. Select what kind of Activity session/Action info to add - select the appropriate option

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period: Occurred between Request date and Request outcome date

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period = Occurred between Request date and Request outcome date

Activity session and/or Action information:

1. Select which dates the Activity session/Action should have occurred between (selected dates included)= Request date and Request outcome date

2. Select if Activity sessions/Actions should have occurred in reporting period or not - select the appropriate option

3. Select what kind of Activity session/Action info to add - select the appropriate option

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period: Activity session/must have occurred during reporting period

Select how to relate Activity session and Action data to Request/Financial pathways and reporting period to the reporting period - Activity session/must have occurred during reporting period

Activity session and/or Action information:

1. Select which dates the Activity session/Action should have occurred between (selected dates included)= As above, select appropriate option

2. Select if Activity sessions/Actions should have occurred in reporting period or not - select the appropriate option

Add information to report

Select Requests/Financial pathways related data

Request information - Add Request/Financial pathway info

Add information to report

Select Requests/Financial pathways related data - Select Request detail field to add

Request information - Add Request detail field

Add information to report

Select Requests/Financial pathways related data - Select Financial pathway detail field to add

Request information - Add Financial pathway detail field

Add information to report

Select Requests/Financial pathways related data - Select Request status to add start date

Request information - Add Request status start date

Add information to report

Select Requests/Financial pathways related data - Select Financial pathway status to add start date

Request information - Add Financial pathway status start date

Add information to report

Select Wellbeing aspect related data - Select Financial pathway Wellbeing aspect to add Wellbeing aspects levels on

Request information - Add Wellbeing aspect level for Financial pathway Wellbeing aspect

Add information to report

Select Wellbeing aspect related data - Add list of improved Wellbeing aspects

Request information - Add list of improved Financial pathway Wellbeing aspect

Add information to report

Select Tangata related data - Select Tangata info to add

Tangata information

1. Select which tangata should be added = Select the most appropriate option

2. Select Tangata information = select the most appropriate option - age, ethnicity, gender, iwi/hapu

Add information to report

Select Tangata related data - Select Tangata interval style info to add = Responsible Kaimahi

Responsibility information - Add Responsible Kaimahi

Add information to report

Select Tangata related data - Select Tangata interval style info to add = Tangata’s tag name

Tangata information

1. Select which tangata should be added = Select the most appropriate option

2. Select Add the date(s) Tangata’s tag name was put on = select the most appropriate option

3. Select when the Tangata’s tag name was active = select the most appropriate option

Add information to report

Select Activity session related data - Select Activity session info to add

Activity session and/or Action information:

1. Select which dates the Activity session/Action should have occurred between (selected dates included)= As above, select appropriate option

2. Select if Activity sessions/Actions should have occurred in reporting period or not - select the appropriate option

3. Select what kind of Activity session/Action info to add = Add Activity sessions with/withou Actions that occurred during the Activity session

4. Add Activity session info - select appropriate option

Add information to report

Select Action related data - Select Action info to add

Activity session and/or Action information:

1. Select which dates the Activity session/Action should have occurred between (selected dates included)= As above, select appropriate option

2. Select if Activity sessions/Actions should have occurred in reporting period or not - select the appropriate option

3. Select what kind of Activity session/Action info to add = choose appropriate option

4. Add Action info - select appropriate option

Look up sheet

Mapping

Old Version

New Version

Select Requests/Financial pathway: Financial pathway outcome date

How to relate relate data to reporting period = By date in period, Select date to be in period = Financial pathway outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Financial pathway outcome date

Select Requests/Financial pathway: Financial pathway start date

How to relate relate data to reporting period = By date in period, Select date to be in period = Financial pathway start date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Financial pathway start date

Select Requests/Financial pathway: Request date

How to relate relate data to reporting period = By date in period, Select date to be in period = Request date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Request date

Select Requests/Financial pathway: Request decision date

How to relate relate data to reporting period = By date in period, Select date to be in period = Request decision date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Request decision date

Select Requests/Financial pathway: Request outcome date

How to relate relate data to reporting period = By date in period, Select date to be in period = Request outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Request outcome date

Select Requests/Financial pathway: Specific Request status start date

How to relate relate data to reporting period = By date in period, Select date to be in period = Specific Request status start date, Select specific Request status = select appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Specific Request status start date

3. Which specific status? = Select appropriate option

Select Requests/Financial pathway: Specific Financial pathway status start date

How to relate relate data to reporting period = By date in period, Select date to be in period = Specific Financial pathway status start date, Select specific Request status = select appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Specific date being in reporting period

2. Which date should be in period? = Specific Financial pathway status start date

3. Which specific status? = Select appropriate option

Select Requests/Financial pathway: Requests without Request decision date - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Requests without Request decision date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Requests without Request decision date

Select Requests/Financial pathway: Financial pathway without Financial pathway outcome date - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Financial pathway without Financial pathway outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Financial pathway without Financial pathway outcome date

Select Requests/Financial pathway: Requests without Request outcome date - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Requests without Request outcome date

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Requests without Request outcome date

Select Requests/Financial pathway: Specific Request status - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Specific Request status, Select specific Request status = choose appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Specific Request status without Request status end date

4. Which specific status? = choose appropriate option

Select Requests/Financial pathway: Specific Financial pathway status - active at start, end or any time during the period

How to relate relate data to reporting period = Choose either active at start, end or any time during the period, Select how active = Specific Financial pathway status, Select specific Request status = choose appropriate option

How should the Requests/Financial pathways relate to the reporting period

1. How should the Requests/Financial pathways relate to the reporting period? = Active at start, end or any time during reporting period

2. When should the Requests be active? = Choose either active at start, end or any time during the period

3. How should the Requests be active? = Specific Financial pathway status without Financial pathway status end date

4. Which specific status? = choose appropriate option

Did this answer your question?